one room challenge - finalized accessory selections

So, my laundry room design has already changed since yesterday's post! After doing some measuring I confirmed that the light fixture I had my eye on definitely wouldn't fit without moving the electrical. I went on an extensive search for something that wouldn't interfere with the cabinet door swing and just as I was ready to give up and convert to recessed lighting it hit me - the Visual Comfort Hicks Pendant! I have wanted to use this for years, but I never had the right place for it. The small pendant measures in at 8.5" wide, which is the exact measurement that we need! To solidify the deal, Horchow had them in stock and 30% off, so this baby is on its way to me!

Since I splurged a little on the light fixture, I had to re-evaluate my art selection. The paintings I had originally chosen were on the small side, which meant I would need to buy two to make them work in our long room. I found this round mirror for one of my recent e-design projects, and it's just the right size and style for this room. I lucked out and also scored this on major sale, so I officially have all of the accessories purchased and finalized. Now I'm starting to get excited to see it all come together!

one room challenge - week three

Welcome back! If you're just now joining me for the One Room Challenge, make sure to check out where we started in week one and week two!

Here is a look at some of the finishing touches that I plan to add to our laundry room. I'm going for a modern coastal sort of vibe in here, and I think this artwork by Susie Bettenhausen is total perfection for this space.

>> light fixturebrass hookspainting onepainting two, runner<<

Last Thursday we took out our old flooring and prepped for the new floor.

We started tiling on Friday night, and surprised ourselves by getting the floors tiled and grouted by early Sunday evening, allowing us to have a little bit of time to relax over the weekend.

We put in the new cabinets on Monday and got the door painted and hung by Monday night.

This floor-to-ceiling cabinet is my organizational dream. It holds all of my cleaning supplies perfectly.

We will lower the shelf above the washer and dryer once we tile the backsplash, which we've decided to extend along the back wall (thank you for your input last week!). It looks a little plain now, but once the countertops, backsplash, new hardware, and accessories are installed, it will add much needed texture.

I'm still on the fence about my light fixture situation. The cabinet doors clear our current light by less than 1/2", which makes me a little nervous about my light fixture choice. Right now, moving it isn't an option because we just recently had the walls and ceiling skim coated and I really don't want to mess with repairing the ceiling myself. If the light fixture I chose doesn't work, my plans are to use it in our hallway and convert this to recessed lighting for now. Stay tuned for how this pans out!

Here is what we have left to finish:

  • Install new flooring

  • Install baseboards - These are cut and ready to be painted!

  • Possibly install crown molding This is now out due to the height of the cabinets.

  • Install new cabinetry

  • Paint interior door and water heater closet door

  • Replace water heater closet door hardware

  • Install cabinetry hardware

  • Install marble countertop

  • Install backsplash

  • New light fixture

  • Finish painting walls and ceiling

  • Install solar tube lighting for natural light. After looking at the Solatube lighting this weekend I found that I was not a fan of the fluorescent looking light the tubes gave off. We're getting all of our windows replaced in a couple of weeks, so we're going to talk to them about how much it would be to add a completely new window into the space.

  • New rug, art, baskets, and hooks