one room challenge week 2: the look

Hello! I almost forgot how quickly the one room challenge flies by. Last week we finished all of the touch-up paint, painted all of the new trim and shelving, put up the door trim that has been MIA since we did demo (last October!), and put the first coat of Red Guard waterproofing on the shower walls. Since this may be your first time joining me, or in case you have forgotten since the last challenge, I figured I'd share our design plan with you again. This is staying the exact same as it was during the last challenge mostly because I've already purchased everything.

These shelf brackets are a new addition to the design plan. They arrived yesterday, but instead of the two sets I ordered, they only sent one! Thankfully they're correcting the problem and the other set should be on the way to me shortly.

On the agenda for this week: 

1) Install and grout our shower floor tile, 2) attach all baseboards, 3) install vanity mirror, 4) schedule fabricator and plumber, and 5) begin tiling our shower walls. The weather has been iffy recently, so I'm really hoping it cooperates with us this week so we can cut our tile.

Here is a recap of our to-do list:

  • waterproof shower walls

  • finish tiling floor/shower floor

  • tile shower walls and niche

  • paint touch-ups (done!)

  • install baseboards and trim (done!)

  • install crown moulding

  • install open shelving

  • install vanity

  • install marble countertop

  • plumbing fixtures for shower and vanity

  • shower glass enclosure

  • put up new mirror

  • new roman shade for window

  • artwork and styling

You can catch up on the whole project by looking at week 1week 2week 3, and week 4 from the last challenge. I'm also sharing progress on instagram and behind the scenes on snapchat (scg_interiors)! 

As always, thank you to Linda at Calling it Home for hosting this challenge! Make sure to check out both the Wednesday and Thursday participants to see all the other fabulous projects that bloggers are creating!